The City of Ridgeland selected Waggoner Engineering to design and manage the construction of the East Lake Harbour Drive Rehabilitation project (ELHD). The ELHD project, situated between Northpark Drive and Breakers Lane, is a 1.3-mile multilane urban arterial roadway.

LPA Project

The project is a Local Public Agency (LPA) project with Mississippi Department of Transportation (MDOT) oversight administered through MDOT’s LPA division. The Waggoner Team navigated the project through MDOT’s LPA process awarding the construction contract within 4 months of project activation.

 

The Details

The rehabilitation project included roadway base repairs, widening, and overlaying the existing roadway providing a two foot paved shoulder and rumble strips. Additional work included traffic signals upgrades to four traffic signals within the project limits. The traffic signal upgrades included modifications to traffic cabinets, addition of video detection, and traffic management center modifications at Ridgeland City Hall.